News
Industry News
Company News
Certifications
Contact Us
Tel: + 86-755-23091101&+86-755-23091100  
Fax: + 86-755-23091102   
Information: info@ipandee.com
address: Floor 2, building A2, LiLang Software Park, No. 31, Bulan Road, Nanwan street, Longgang District, Shenzhen   
China Post code: 518000
Contact Now
Follow us
News
Your position: Home > News > Industry News > Japan's PV demand

Japan's PV demand

2014-09-01 22:42:51

Hipments of PV modules for use in all-embracing projects in Japan rose by 45% in the aboriginal division of the 2014 Japanese banking year, according to abstracts appear this morning.

A account and alternation of tables appear by the Japan Photovoltaic Energy Association (JPVEA), a loosely-formed barter body, appearance abstracts for the aeon from April to July this year. Japan's banking year begins at the end of March. JPVEA took a sample of 47 manufacturers, both calm and adopted and asked them for statistics on their shipments to date.

JPVEA accustomed replies from 39 of those companies, which cover Japanese names such as Kyocera and Panasonic Sanyo alongside adopted competitors and their subsidiaries such as Hanwha Q Cells, Renesola Japan and Trina Solar Japan.

Within the Japanese calm market, shipments of modules to the residential bazaar stood at 86% of the agnate aeon endure year?“ in added words a 14% abatement in volume. Meanwhile non-residential projects acclimated 162% of the aggregate of modules delivered in the above aeon endure year. Residential bore shipments totalled 493,478kW, while non-residential projects acclimated 1,388,305kW of modules. This amount for non-residential shipments includes 657,144kW of modules from ability generators of over 500kW for the purpose of affairs electricity, i.e. utility-scale, which saw the above 45% rise.

Module exports from Japan accounted for just 2% of the accomplished market, signalling able calm appeal as able-bodied as highlighting the about amount of Japanese modules compared to their Chinese counterparts.

In a contempo account with PV Tech, Dr Hiroshi Matsukawa of assay close RTS PV said that he accepted utility-scale projects to drive able near-term appeal for solar modules, as developers rushed to complete projects that accept been accustomed and not built. It is aswell accepted that the feed-in assessment (FiT) offered in Japan will abatement afresh in April of next year. Matsukawa said that he accepted the excess of unbuilt projects to abide to drive the architecture of ample calibration projects over the next two years at least. Matsukawa said about that the future, abnormally the aeon that will chase 2017 if Japan's FiT arrangement is accepted to finish, should be the Japanese PV industry's most acute concern.


https://kefu5.cckefucloud.com/vclient/chat/?websiteid=p9rjd9g58z6e70x5e6vpx31vpm2kwyb4&wc=39157e7a&clerkid=906266